How to formwork stairs? Design, assembly, and concreting.
How to formwork stairs to ensure the structure is stable and consistent with the design? Properly constructed formwork determines the geometry of the steps, the safety of use, and the durability of the entire structure. Learn how to prepare the formwork for stairs step by step and perform error-free concreting.
What is stair formwork?
Stair formwork is one of the stages of reinforced concrete construction. It involves preparing a temporary form into which the concrete mix is poured. This form gives the future stairs their final shape . This means that the formwork must precisely reflect the structural design. Even slight deviations can later result in uneven treads or problems with the installation of the finishing touches.
The formwork process itself can be divided into several stages. First, the structural elements of the formwork and supports that will support the weight of the fresh concrete mix are prepared. Next, the formwork is installed and all joints are carefully sealed to prevent concrete leakage. The next step is pouring the concrete mix and properly compacting it. Once the concreting is complete, the concrete curing stage begins, and only after the required strength is achieved can the formwork be dismantled.
The formwork is dismantled only once the concrete has reached the appropriate strength . This typically occurs approximately 3-4 weeks after pouring the mix, although the exact time depends on weather conditions and the characteristics of the concrete used.
How to formwork stairs? Step-by-step instructions.
The design process can be divided into several basic steps:
- Documentation verification – first, the construction design and construction requirements are checked; the expected operational loads are analyzed, as well as the assembly conditions and the availability of space on the construction site,
- determining the ergonomic parameters – the next step is to determine the riser height and the step width; the most common values are: riser height (16-18 cm), step width (25-30 cm), stair inclination angle (approx. 30-35°),
- stair beam and supports – the design specifies the location of the stair beam, its cross-section and the material of manufacture,
- selection of formwork elements – at this stage, the type of formwork panels, the spacing of supports and the method of attaching the formwork elements are determined; the shape of the formwork for steps and landings is also determined,
- preparation of detailed drawings – the documentation should include a horizontal plan, longitudinal and cross-sections, and assembly details,
- bill of materials – at the end, a list of materials and their quantities is prepared.
Well-prepared construction documentation significantly streamlines construction work. It provides the assembly team with clear guidelines regarding the work sequence, how to connect formwork elements, and the location of steps and landings.
Foundations and reinforcement of stairs
Every stair structure must rest on properly designed foundations . These transfer vertical and horizontal loads to the ground, ensuring the stability of the entire structure. In practice , a strip foundation, a foundation slab, or a monolithic connection to the ceiling are most commonly used for stairs. The choice of solution depends primarily on the soil's load-bearing capacity and the static configuration of the structure.
Stair beams , the load-bearing elements responsible for transferring loads from the stair flight, also play a crucial role. They largely determine the stability of the entire structure. The arrangement of supports, in turn, influences the direction of the reinforcement. Tension bars are typically placed at the bottom of the beam, while supplementary bars are placed at the top of the element.
Stair reinforcement most often consists of longitudinal bars and transverse reinforcement . Another crucial parameter is the concrete cover , which is the layer of concrete that protects the steel from corrosion. It typically ranges from 25 to 40 mm, depending on environmental conditions and the element's exposure to moisture.
Reinforced concrete stairs are most often constructed using C20/25 or C25/30 concrete . During installation, the rods are usually connected with tie wire, and their overlaps should be at least 30 rod diameters long in the case of smooth steel.
The reinforcement of the staircase should also be anchored in the foundation or ceiling, which ensures the proper functioning of the entire structural system.
Assembly of formwork and preparation for pouring
Before commencing formwork installation, it's worth carefully reviewing the design documentation. Proper site preparation is equally important – the ground should be clean and level, and access for crews and materials should be well planned .
Individual formwork elements are most often connected using screws or bolts, eliminating play and ensuring the structure's rigidity. The side elements of the form are stabilized with struts and anchors, which protect the formwork from deformation under the pressure of the concrete.
Proper support for the structure is also crucial. Wooden props or adjustable steel supports are used for this purpose. Larger projects often also utilize telescopic supports and professional measuring tools. If these are not available on site, they can be easily rented from Ramirent construction equipment rental.
To further stabilize the formwork, cross braces and reinforcing angles are used. They limit element deflection and prevent shifting during concreting and compaction.
Equally important is the tightness of the joints . Well-sealed edges prevent the leakage of cement grout, which could weaken the concrete structure. Sealing tapes or construction silicone are used for this purpose.
Concrete pouring and maintenance
The process of concreting stairs should proceed smoothly and evenly. It's best to do it in a single pass to avoid discontinuities in the concrete structure.
The mix is laid in layers and compacted using concrete vibrators. This eliminates air pockets and improves the material's uniformity. For larger projects, the concrete can be transported using concrete pumps or hoppers.
After concreting is complete, the steps and landings are pre-leveled . Depending on the technology, further finishing work, such as creating expansion joints, is usually carried out after approximately 12-24 hours.
A very important step is concrete curing . It begins almost immediately after the surface has set and primarily involves maintaining the appropriate moisture content of the material.
Under typical conditions , concrete should be hydrated for at least 7 days at a temperature of approximately 20°C . During this time, it reaches approximately 60-70% of its target strength. Concrete typically reaches its full structural strength after 28 days.
Stair finishing and landings
The final stage of construction is finishing the stairs. This is what largely determines the durability of the structure, comfort of use, and aesthetics of the entire space.
One important element is the landings , which are horizontal slabs located between the flights of stairs. They serve as a resting place, allow for changes in direction, and improve safety.
The landing slab should be properly connected to the stairway and properly sealed. Expansion joints and flexible sealants are often used at the joints to reduce the risk of cracking.
Anti-slip grooves on steps are also a common solution. They improve footwear traction and help drain water from the surface of outdoor stairs. Typical dimensions of such grooves are approximately 3-6 mm deep and 6-10 mm wide.
The surface of the stairs can be additionally protected with a paint coating. Landings and steps can also be finished with other materials – ceramic tiles, natural stone, or wood.