Construction of the Boneselect Hall

PROJECT
The project concerns the construction of a modern production hall for Boneselect, located in Brzezinski Holendry. The aim of the investment is to create space that will enable the company to further develop and increase its production capacity.
REALISATION
A key element in the success of this project was our cooperation with the Ramirent construction equipment rental company in Kalisz, which provided the necessary machinery for the various stages of construction. Among the equipment rented were lifts, which played a vital role in working at height and in accessing difficult areas within the hall.
The electric articulating basket lift was mainly used to lift materials with precision and allow safe access to hard-to-reach areas of the site. The electric scissor lift, on the other hand, was ideal for working at higher levels of the building and for precise tasks in confined spaces. Thanks to its stability, it provided safety when carrying out assembly, installation and other activities requiring work at great heights, while also enabling safe lifting of both people and materials in narrow parts of the hall.
The right type of lift was selected for each stage of construction, allowing the equipment to be used optimally for the specific needs and working conditions. Thanks to the well-chosen equipment, the construction process ran smoothly and without delays. The adaptation of the equipment to the changing requirements of the construction site and the rapid response of the rental company allowed the work to be carried out efficiently and in complete safety.